Skip to content
Monday – Friday: 7:30 a.m. – 5:00 p.m.(850) 555-0100

The estimate

What a written estimate includes

There is no price list here. A roof isn't a product, so we write each one down after we see it. A line that isn't on paper isn't in the price.

  • Tear-off and disposal

    The old roof comes off and leaves with us.

  • Deck check

    With a per-sheet price for any sheet we replace.

  • Underlayment and edges

    Underlayment, drip edge and starter strip.

  • Covering and flashing

    Shingles, metal or tile, ridge caps and flashing.

  • Vents and pipe boots

    Every roof penetration, listed.

  • Permit and inspection

    Pulled by us, with the county's final inspection.

  • Cleanup and papers

    A magnet sweep and the warranty papers.

  • Options as separate lines

    A sealed secondary layer, for example, is its own line.

Not on it

What it leaves out

We say so before we start.

  • Rotted wood beyond the deck

    Rafters, fascia or soffit found once the roof is open.

  • Chimneys and skylights

    Masonry work and skylight replacement.

  • Gutters

    We tell you if they need attention, and who does it.

  • Wall carpentry

    Straps and other work below the roof.

  • Interior repairs

    Ceilings and walls stained by old leaks.

  • Inspector changes

    Code items an inspector asks for on the day.

The visit

What happens at the visit

The visit and the written estimate cost nothing. The estimate holds for thirty days.

  1. 01

    Step 1: You book it

    By phone, text or the form. We ask the address and whether water is coming in.

  2. 02

    Step 2: We walk the outside

    From the ground first, with photos of the roof lines, gutters and vents.

  3. 03

    Step 3: We go up

    On the roof, tied off, or by drone when the roof is steep or wet.

  4. 04

    Step 4: We go in the attic

    For stains, wet wood, how the rafters meet the walls and how the attic breathes.

  5. 05

    Step 5: We measure

    The roof's area in squares, its pitch and what comes through it.

  6. 06

    Step 6: We show you the photos

    What we found, and whether it is a repair or a replacement.

  7. 07

    Step 7: You get it in writing

    Options, each with its lines, left with you to read.

The fifteen

What moves the price

  • Roof area

    Measured in squares of 100 square feet.

  • Pitch

    Steep roofs need staging and more time.

  • Shape

    Hips, valleys and dormers add cuts and flashing.

  • Material

    Shingle line, metal profile or tile.

  • Layers to remove

    Two layers cost more to tear off and haul.

  • Deck condition

    Found when the old roof comes off, and priced per sheet.

  • Underlayment

    Standard paper or a sealed, self-adhering layer.

  • Flashing and penetrations

    Chimneys, walls, vents and skylights.

  • Ventilation

    Intake and exhaust the attic needs.

  • Access

    Trees, fences, power lines and a tight drive.

  • Warranty tier

    Which manufacturer system and workmanship terms you choose.

  • Code and permit

    What the county requires and charges.

  • Season

    Hurricane season fills schedules.

  • Add-ons at the same time

    Straps, vent upgrades or skylights while the roof is open.

  • Storm-season demand

    After a big storm, material and crews are scarce.

Estimate questions

Do you require a deposit?

Payment terms are on the written estimate before you sign, along with when each payment is due. We don't ask you to pay for the whole job before it starts.

When do I get the number?

In writing, after the visit, as a flat price for the work listed. If we find rotten decking once the old roof is off, the per-sheet price on the estimate is what you pay.

Do I need a permit?

For a replacement, almost always. We pull it for you and the cost is on the estimate.

Ready for the visit?

Tell us where the roof is and when you're home.